  • In Situ Failure Investigation of Weld Cracking in a Linz

     · Linz–Donawitz (LD) vessel is an integral part of the blast furnace–basic oxygen furnace route of steelmaking. Failures of the LD vessel can result in safety issues as well as production loss. In the event of any such failure the thrust should be to carry out the investigation at the minimum lead time and suggest for corrective actions to prevent any recurrence in the future.

    Get Price
  • Development of a New Raceway Adiabatic Flame Temperature

    Investigation of No. 6 Blast Furnace Hot Stove Ceramic Burner Problems and Development of Hot Repair Techniques Modern Innovative Process Control System as Part of a Successful Modernization and Relining of a Blast Furnace. Scharf J. / Rauch C. / Iron and Steel Successful Iron Nuggets Production at Itmk3 Pilot Plant. Tsuge O

    Get Price
  • Blast furnace 1 in Donawitz Temporary relining successful

     · The extended intermediate relining of blast furnace 1 in Donawitz was not without its challenges. But these challenges were successfully overcome as a team. After just 64 days the blast furnace was blown-in on schedule in the end of summer 2018.

    Get Price
  • voestalpine-linz-hochofen-5-6voestalpine

     · The right spirit brings successful sales. Gerhard Gerstmayr was also involved in the new voestalpine image campaign. When he s not in front of the camera he s responsible for sales at voestalpine BÖHLER Aerospace as Vice President Sales. A-4020 Linz

    Get Price
  • CRITICAL FACTORS AFFECTING SUCCESS OF A BLAST FURNACE

    Critical success factors are the bottom line for the successful completion while countering the factors of failure. This research study mainly focuses on relining of blast furnace as a project and so as to identify the critical success factors that influence the project success in a

    Get Price
  • Protection of Blast Furnace Hearth Lining by the Addition

     · Successful formation of the protection layer at the eroded regions of the hearth lining depends largely on the flow and the heat transfer of the HM and hence the furnace operating conditions. Further the amount of the TiO2 containing material needed is to be enough to form the protection layer but at the same time is to be minmized as excess

    Get Price
  • ARMATURY Group goggle valves for blast furnace in Linz

     · ARMATURY Group produced two goggle valves with a total weight of over than 18 tons for the blast furnace in Linz. The company acquired a contract for the supply of these metallurgical valves last year. The goggle valves have already integrated into the blast furnace for DN 1800 and DN 800.

    Get Price
  • IBFRConsulting Expertise Dr. HartigPublications

     · European Blast Furnace engineers meeting VOEST-Alpine Stahl Linz. Sept. 1994 Integrated use of Burden-Profile-Probe and In-Burden-Probe for gas flow control in the Blast Furnace 54 th Ironmaking Conference Nashville TN. April 1995 Blast furnace Ironmaking state of the art La Révue de Métallurgie-CIT. Oct. Nov. 1995 Measures for

    Get Price
  • CRITICAL FACTORS AFFECTING SUCCESS OF A BLAST FURNACE

    Critical success factors are the bottom line for the successful completion while countering the factors of failure. This research study mainly focuses on relining of blast furnace as a project and so as to identify the critical success factors that influence the project success in a

    Get Price
  • AISTech2018 Dry Slag GranulationThe Future Way to

     · Dry Slag GranulationThe Future Way to Granulate Blast Furnace Slag Fleischanderl A.1 Fenzl T. 2 Neuhold R. 3 1Primetals Technologies Austria Turmstrasse 44 Linz Austria 4031 Phone 43 732 6592 77125

    Get Price
  • Copper staves for blast furnacesKME

     · 6 for blastun bsce 2 468 fb 9 4611la 03t5l0 Blast furnace cooling Stave coolers first began to be developed in the late 1960s. The rise in furnace-productivity was accompanied by a greater demand for efficient cooling systems. Modern-day copper stave coolers insulate the outer shell from the process heat generated in highly stressed furnaces.

    Get Price
  • A review on CO2 mitigation in the Iron and Steel industry

     · The blast furnace is assumed to produce 8.6 kt pig iron /day emitting 6.3 kt CO2 /day. Thus to process the 100 of the CO 2 emissions an electrolyzer of 359.6 MWe would be required. Moreover the thermal necessities for the electrolyzer and the endothermic RWGS

    Get Price
  • (PDF) Blast Furnace Operation with 100 Extruded

    The BREX in amount of tons per day are being melted in the Blast Furnace.The operation has started in the May 2011 with 10 of the BREX in the charge. Then this share has been gradually increasing. When working on the charge consisting of 80 of the BREX and 20 of iron ore the coke consumption decreased by 150 kg/t of cast iron (22

    Get Price
  • RUSSIA TULACHERMETBlast Furnace n°3 Relining

     · BF3 Capital relining is the third successful project carried out in 5 five years by Seven Refractories Russia in Tulachermet. Currently all the 3 blast furnaces in the plant have refractory lining provided by Seven. Blast Furnace n°3 Relining Tulachermet.

    Get Price
  • Transition of blast furnace revamping technology and

     · Transition of blast furnace revamping technology and challenge to a super- successful in reducing to period 50 days by establishing super large-block method technology that blast furnace and structure are exchanged at single block. Key word Blast Furnace Construction Relining Reconstruction Replacement Renewal Erection

    Get Price
  • In Situ Failure Investigation of Weld Cracking in a Linz

     · Linz–Donawitz (LD) vessel is an integral part of the blast furnace–basic oxygen furnace route of steelmaking. Failures of the LD vessel can result in safety issues as well as production loss. In the event of any such failure the thrust should be to carry out the investigation at the minimum lead time and suggest for corrective actions to prevent any recurrence in the future.

    Get Price
  • RADHA RAMAN ABHYUDAYSr. Manger Operation (Blast

    Metallurgical Engineer from BIT SINDRI and having around 12 years of experience in Blast furnace operation and Iron making technology .Currently associated with TATA STEEL as a Sr. Manager in G Blast furnace. Facilitating a team of plant personnel to improve their capabilities in BF through process (raw material to hot metal slag) monitoring.

    Get Price
  • RUSSIA TULACHERMETBlast Furnace n°3 Relining

     · BF3 Capital relining is the third successful project carried out in 5 five years by Seven Refractories Russia in Tulachermet. Currently all the 3 blast furnaces in the plant have refractory lining provided by Seven. Blast Furnace n°3 Relining Tulachermet.

    Get Price
  • Copper staves for blast furnacesKME

     · 6 for blastun bsce 2 468 fb 9 4611la 03t5l0 Blast furnace cooling Stave coolers first began to be developed in the late 1960s. The rise in furnace-productivity was accompanied by a greater demand for efficient cooling systems. Modern-day copper stave coolers insulate the outer shell from the process heat generated in highly stressed furnaces.

    Get Price
  • CRITICAL FACTORS AFFECTING SUCCESS OF A BLAST

     · meeting the schedule. Critical success factors are the bottom line for the successful completion while countering the factors of failure. This research study mainly focuses on relining of blast furnace as a project and so as to identify the critical success factors that influence the project success in a private steel manufacturing company in

    Get Price
  • ARMATURY Group goggle valves for blast furnace in Linz

     · ARMATURY Group produced two goggle valves with a total weight of over than 18 tons for the blast furnace in Linz. The company acquired a contract for the supply of these metallurgical valves last year. The goggle valves have already integrated into the blast furnace for DN 1800 and DN 800.

    Get Price
  • In Situ Failure Investigation of Weld Cracking in a Linz

     · Linz–Donawitz (LD) vessel is an integral part of the blast furnace–basic oxygen furnace route of steelmaking. Failures of the LD vessel can result in safety issues as well as production loss. In the event of any such failure the thrust should be to carry out the investigation at the minimum lead time and suggest for corrective actions to prevent any recurrence in the future.

    Get Price
  • Copper staves for blast furnacesKME

     · 6 for blastun bsce 2 468 fb 9 4611la 03t5l0 Blast furnace cooling Stave coolers first began to be developed in the late 1960s. The rise in furnace-productivity was accompanied by a greater demand for efficient cooling systems. Modern-day copper stave coolers insulate the outer shell from the process heat generated in highly stressed furnaces.

    Get Price
  • CRITICAL FACTORS AFFECTING SUCCESS OF A BLAST

     · meeting the schedule. Critical success factors are the bottom line for the successful completion while countering the factors of failure. This research study mainly focuses on relining of blast furnace as a project and so as to identify the critical success factors that influence the project success in a private steel manufacturing company in

    Get Price
  • Reline of blast furnace No 6 at Corus IJmuiden The

    SFX and Citation Linker. Frequently asked questions concerning SFX Electronic books. The e-book database EBC Audiovisual media Research data Alliance and national licences

    Get Price
  • Refractory Lining of the Electric Arc FurnaceIspatGuru

     · Refractory Lining of the Electric Arc Furnace. satyendra May 6 2020 0 Comments AC EAF DC EAF EAF EBT Fettling guniting hearth magnesite Monolithic lining roof Taphole Refractory Lining of the Electric Arc Furnace. Refractories are those materials which withstand high temperature without a significant change in chemical or physical properties.

    Get Price
  • CRITICAL FACTORS AFFECTING SUCCESS OF A BLAST

     · meeting the schedule. Critical success factors are the bottom line for the successful completion while countering the factors of failure. This research study mainly focuses on relining of blast furnace as a project and so as to identify the critical success factors that influence the project success in a private steel manufacturing company in

    Get Price
  • DIRECT FROM MIDREX

     · blast furnace/basic oxygen furnace (BF/BOF). The philosophy at the time was state involvement for generating profitability in the social sense while economic profitability was secondary. Since the 1990s as the private sector was granted more access to the steel industry there have been huge investments in new

    Get Price
  • Salamander Tapping for Capital Repairs of Blast Furnace

     · Salamander tapping of a blast furnace is the final tapping after the furnace is blown down in order to drain the last liquid iron from the furnace hearth. Because of its rare occurrence a salamander tapping represents in most of the steel plants a specialized job which requires a lot of preparation. A solidified salamander is normally difficult

    Get Price

Products News

  • drying stages during the heating of high‐alumina ultra
  • fiberfrax duraboard distributors
  • castable firebrickcastable refractory cement mix
  • cyclic voltammetry curves
  • effect of alumina fines on vibratable high alumina lowcheap low cement refractory castable
  • chrome corundum refractory castables for hot blast stove
  • refractory materials for furnacecorundum spinel castable
  • castable cement refractory cement 123yilong
  • sgl carbon
  • alsic cte
  • holt science and technology
  • square brick fire pit designs
  • field furnace refractories pty ltd
  • high temperature calcium silicate

Product Center

  • Alumina Hollow Ball Bricks
  • Corundum Spinel Castable
  • High Alumina Refractory Cement
  • High Alumina Low Cement Castable
  • High Alumina Refractory Ramming Mass
  • Trough Refractory Castable
  • Magnesium Iron Spinel Brick
  • Mullite Brick
  • Zirconium Mullite Brick

Hot Products

  • Light Weight Silica Insulation Brick
  • Zirconia Hollow Sphere Brick
  • Corundum Refractory Castable
  • Heavy Alkali Resistant Castable
  • High Alumina Low Cement Castable
  • High Alumina Self Flowing Castable
  • Micro Expansion Refractory Plastic
  • Phosphate Refractory Mud
  • Magnesia Zircon Brick

Images Show

About Us

Rongsheng's main products are various types of unshaped refractory products, which are widely used in metallurgy, nonferrous metals, building materials, electric power, petrochemical and other industries.

Rongsheng pays attention to technological innovation and product research and development, and has established close cooperative relations with many universities and scientific research institutes.

Zhengzhou Rongsheng Company © Copyrights. Sitemap